Koura, an Orbia company, was preparing for one of the largest capital projects in its history at its St. Gabriel, Louisiana site. The project carried significant complexity: overlapping greenfield developments, a high-stakes joint venture, and interdependent timelines.
Several risks stood out:
- No established Owner’s Engineering Team to lead scope and control definition.
- Fragmented technical data that was incomplete or siloed, threatening FEL-2 readiness.
- Organizational friction around decision rights and team responsibilities.
- Compressed timelines requiring rapid maturity of deliverables.
- Owner’s Engineering Team established and fully functional within months.
- Critical technical data validated and integrated into FEL-2 deliverables.
- FEL-2 package completed on schedule, compliant with industry standards and corporate requirements.
- Improved collaboration between corporate, site, and contractor teams, providing a stronger foundation for decision-making.
Ultimately, changing underlying conditions led Koura to shelve the project before execution. This outcome highlights one of FEL’s most important functions: ensuring that major capital projects only advance when definition maturity and risk justify the investment. By completing a disciplined FEL-2, Koura made an informed decision that protected the company from greater downside exposure.
Large projects demand strong Owner’s capability from the start. Whether your team needs to build FEL-2 discipline, stand up an Owner’s Engineering function, or improve definition maturity.